Gallery Images
![Franklin to Ustick](/sites/default/files/styles/gallery_large_cropped/public/gallery/project/IMG_0508.jpg?itok=jizjZt6_)
![Franklin to Ustick](/sites/default/files/styles/gallery_large_cropped/public/gallery/project/SH-16%20Franklin%20042024.png?itok=B8lA3jHm)
![Franklin to Ustick](/sites/default/files/styles/gallery_large_cropped/public/gallery/project/IMG_0509_0.jpg?itok=V7t-tH2D)
![Franklin to Ustick](/sites/default/files/styles/gallery_large_cropped/public/gallery/project/IMG_0507.jpg?itok=PAVT1qtM)
![Franklin to Ustick](/sites/default/files/styles/gallery_large_cropped/public/gallery/project/IMG_0508.jpg?itok=jizjZt6_)
![Franklin to Ustick](/sites/default/files/styles/gallery_large_cropped/public/gallery/project/SH-16%20Franklin%20042024.png?itok=B8lA3jHm)
![Franklin to Ustick](/sites/default/files/styles/gallery_large_cropped/public/gallery/project/IMG_0509_0.jpg?itok=V7t-tH2D)
![Franklin to Ustick](/sites/default/files/styles/gallery_large_cropped/public/gallery/project/IMG_0507.jpg?itok=PAVT1qtM)
Description
This portion of sh-16 includes the work of constructing 2 miles of 4-lane concrete roadway from MP 93.92 to 95.86, with width for future aux. lane & shoulders on SH-16. A 165’ steel bridge, 3 prestressed conc. bridges (114’, 123’, 52’), 9’x 275’ conc. box culvert, & ¼ mile 2-lane asphalt access road. This project contains 758,540 cubic yards of borrow and 41,482 cubic yards of excavation.
Additional Detail Items
Project Details Title
Contract Amount:
Project Details Item
$59,180,610.84
Project Details Title
Work Began Date:
Project Details Item
11/01/2023