Gallery Images


Description
CPC is the prime contractor for this $24.8 million interchange replacement in Caldwell, Idaho. Construction will start in the fall of 2006 and be complete in 2008. The existing two-lane structure will be replaced with a 5-lane concrete-decked steel girder bridge. All four ramps will be replaced, two with concrete. Additionally, Franklin Road will be paved with concrete from Specht Ave. to Aviation Way.
Additional Detail Items